Velden started from nothing in late 1973 during the 3 day week. Keith Marshall and I were founder members with credit for the start up idea going to Keith. A few months later we were joined by Charles Aspinall. We built up a reputation for best practice, a quick response, quality and reliability. The company grew to 100+ employees by the late 1980’s, winning numerous awards along the way.
Unfortunately, alongside many others in the industry, we hit the buffers during the recession of the early 1990’s. With UK manufacturing in big trouble, order books tumbled and companies large and small went to the wall in large numbers. With employee numbers halved and having to make large scale redundancies for the first time, Velden were struggling to survive and at risk of losing everything, Keith and Charles decided to sell their shares. I wanted to continue and somehow managed to buy them out. Employees, customers and suppliers remained loyal and Velden survived an almost impossible situation and lived to tell the tale.
Following this period, Velden featured twice in the BBC Troubleshooter series with Sir John Harvey Jones and gained valuable advice on taking the business forward. Around the turn of the millenium, my son Austin was studying for his ‘A’ levels at school and was ambitious to start his own technology based company. We were already highly dependent on computerised software and were concerned about the millenium bug implications, so Austin moved into the business, rewrote, developed and dramatically improved the in-house V-Mans management system.
During the first decade of the century Velden have been involved in numerous successful projects and have won many new contracts. We have diversified into new areas such as busbar production and specialized machining and welding following the acquisitions of smaller, local companies. After forty years running the company almost seven days per week, I decided to step down from day to day activities to allow Austin to move the company forward in a new, dynamic way.

2019
Increased Turning Capacity
Added a second Nakamura WT150 II
Invested in Nakamura AS200 L
New reception conference facilities
2019
REPLACED OLDER MACHINE
Invested in CMX 800V Vertical Machining Centre


2019
Increased Turning Capacity
Added a second Nakamura WT150 II
Invested in Nakamura AS200 L
New reception conference facilities
2019
REPLACED OLDER MACHINE
Invested in CMX 800V Vertical Machining Centre


2018
ADDED MILLING CAPACITY
Invested in 2 DMU50 5 Axis Universal Machining Centres
2018
REPLACED OLDER MACHINE
Invested in CMX 800V Vertical Machining Centre


2018
ADDED CAPACITY WITH NEW INTELLIGENT MACHINING CENTRE
2017
ADDED CAPACITY FOR LARGER FORMAT VERTICAL MACHINING
Invested in Takumi H16 high speed, bridge type 3 axis vertical machining centre
Change of management structure to include a new Production and Purchasing Manager


2016
OPENED NEW BUSBAR PRODUCTION FACILITY
2016
INCREASED SMALL TURNING CAPACITY
Invested in Citizen L20-XII Sliding Head CNC Lathe
Installed onsite electricity substation to increase power capacity by 4x


2015
INCREASED Â AUTOMATION
Invested in Makino P95 Vertical Machining Centre and Multiple Halter Load Assistant Robots
2015
OPENEDÂ PUMP SYSTEM BUILD & TEST FACILITY
Introduced Full Machine Monitoring System Upgraded Site Security CCTV & Access Control


2014
INTRODUCEDÂ LASER CUTTING SECTION
New Automated Amada Laser Cutter & Pressbrake LED Lighting Project
2014
INVESTED IN TAKISAWA GANTRY LATHE
Major IT Upgrade including New Server, Security & Network Infrastructure


2013
SECUREDÂ BRASS TURNING PACKAGE
Invested in Nakamura WT-150 and Keyence Visual Inspection System
2013
INCREASED LARGE MACHINING CAPACITY


2012
ACQUIRED AMCRON FABRICATION
2011
EXTENDEDÂ VMANS LIVE ERPÂ TO SHOP FLOOR


2011
SOLAR PANELS INSTALLED
2010
WON MACHINING CONTRACT WITH EDWARDS VACUUM


2009
ADDED TIN PLATING FACILITY
2008


2007
2006

2005
2004

2002
2001

1999
1996

1995
1994

1990
1987


1985
1985